2021 April

slope

D&T Prominas | Slope Design Compliance

D&T Prominas | Slope Design Compliance: Planned vs. Accomplished Slope Analysis Would you like to perform a planned versus realized slope analysis of your mine's slopes? With the Slope Design Compliance tool, located in the Op Eng Tools menu, you can perform this analysis simply and quickly using the planned and performed topographies, generating vertical sections between them. After entering the topographies in the tool, the user will specify a Lead Line that will determine where the sections will be generated and also the spacing between them. With the Preview option it is possible to visualize the result and with the Create the result can be saved in a geometric object. Figure 1: Slope Design Compliance. The values obtained refer to the difference in meters between the planned and the actual. So, did you like this tip? For more information about Slope Design…

PU_EngSub

Prominas University – Underground Engineering 2021/1

Are you aware of the news? Here comes a NEW edition of our immersion and technical training program, Prominas University, this time focused on Underground Engineering. The objective of this edition is to train Engineers for the disputed underground mining market, offering free online training. Participants will learn in practice about how the HxGN MinePlan tools and suites work, having direct contact with work routines applied in underground mining. The main topics covered during the program will be: MinePlan 3D – CAD; MinePlan UG Tools – UG Drawing Tools; MinePlan Room and Pillar – Layout and stability control for Cameras and Pillars; MinePlan Ring Design Tool – Drilling and Dismantling Plan UG; MinePlan Reserve – Cubing; MinePlan Planner – Database, operational analysis and reports; MinePlan Stope – Stopes and Sequencing Optimization (Model…

FS1

Hexagon MinePlan UG Full Solution

Hexagon MinePlan UG Full Solution Did you know that MinePlan (MineSight) has complete solutions for the development of underground projects? MinePlan tools provide users with fully integrated solutions ranging from geological exploration surveys, implicit modeling, solutions for building block models, economic assessments of deposits, mine design and sequencing. Want to know more? Follow the topics below with details of the activities carried out in a project carried out by Prominas Mining using the MinePlan tools in full: MinePlan Torque Geology – Database Management and QAQC MinePlan Torque is the geological and blasting database manager. Composed of tools for importing, validating, exporting and generating database reports, relational based on Microsoft SQL. Integrated with Torque, MinePlan QAQC is designed for geologists and other stakeholders…

blast3

D&T Prominas | MinePlan Blast – Safety Zones

D&T Prominas | MinePlan Blast – Safety Zones: Quickly define safety zones in your fire plans for both teams and equipment. In the execution of a fire plan, in addition to the technical requirements necessary to achieve the quality of the blast, safety precautions for the mine teams and equipment are essential. In order to guarantee that all are located in safe places, limits are usually defined that determine exclusion zones, in relation to the place where the dismantling will be carried out. In MinePlan Blast it is possible to automatically and simply define, from the fire plane polygon, limits that represent these safety zones, thus ensuring that dismantling takes place in complete safety. After carrying out the Fire Plan design, the calculation of the fire zone…