Backload to Composites: Routine for editing composites with information from a block model. Did you know that MinePlan makes it possible to write information from a block model into a Drillhole Manager database? Using Compass or Logic, it is possible to edit a Drillhole Manager base with information about the blocks where a certain interval of a compound or 3D point is located. The procedure in question can be found by the code p61701.dat or by the name Backload to Composites in Compass (Figure 1) or by the name Load 3-D Block Geologic Codes to Drillholes in Logic (Figure 2). Figure 1: “Backload to Composites” procedure opened in Compass. Figure 2: “Load 3-D Block Geologic Codes to Drillholes” procedure opened in Logic. The procedure works as follows: using the PCF of a project (file *10.dat) as input data,…

mpso_lock_scheduling

D&T Prominas | Lock Scheduling Periods – MinePlan Schedule Optimizer (MPSO)

Lock Scheduling Periods – MinePlan Schedule Optimizer (MPSO): Agility and efficiency in editing project configurations. Did you know that MinePlan Schedule Optimizer presents, from its most recent version, MPSO 13.20-00, an option that makes it possible to lock periods already sequenced, allowing the user to make edits without losing the sequencing of these periods? Previously, when making edits in Process Flow, such as changing the reservation logic, or adding and removing cuts, the sequencing was restarted after applying, thus losing the results already obtained. According to the amount of data, recalculating the sequencing could take a long time to achieve the result again. With a view to improving the user experience, saving time and avoiding rework, the Lock Schedule Periods option allows the user to lock the sequencing results until the desired period, which allows the necessary edits to be made…

Figura4 sigma

D&T Prominas | MinePlan Sigma – Batch Create

Batch Create in MinePlan Sigma: Creation of several graphs with one click. Did you know that Sigma allows you to create different graphs at once, using categories, cut-offs or content ranges? In today's Tips & Tricks, we will see an easy and quick way to analyze our data. MinePlan's statistics and geostatistics module, called Sigma, is a complete tool for analyzing your data, through the creation of tables and graphs, such as histograms, box plots, and variograms. A practical feature of Sigma is Batch Create, which allows you to create a set of charts of the same type. The graphs created will be differentiated according to a categorical variable, such as: lithology, cut-offs or grade ranges. These graphs are created using the Batch Create option, present in the Sigma top menu. Use…

Release 3

HxGN MinePlan 2023 Release 3

The HxGN MinePlan product team and Prominas Mining are pleased to announce the release of HxGN MinePlan 2023 Release 3, which comes with many improvements and enhancements. Hexagon has worked hard to incorporate your comments and suggestions to ensure this release provides the best possible performance and functionality. We are confident that these improvements will add value to your experience. We welcome your feedback and comments as we continually strive to improve MinePlan to meet your needs. If you have questions about how to install the software, the Prominas Technical Support team is available to support you. Thank you for choosing MinePlan. We look forward to continuing to serve you with exceptional products and services HxGN MinePlan for Engineering What's New in HxGN MinePlan Activity Scheduler v6.7 What's New in HxGN MinePlan Schedule Optimizer v13.20 HxGN MinePlan for Geoscience What's New in…

Release 2

HxGN MinePlan 2023 Release Notes – MPAS and MPSO.

The HxGN MinePlan product team and Prominas are pleased to announce the release of HxGN MinePlan Activity Scheduler v6.6 and HxGN MinePlan Schedule Optimizer v13.10.1, which come with many improvements and enhancements. Hexagon has worked hard to incorporate your comments and suggestions to ensure this release provides the best possible performance and functionality. We are confident that these improvements will add value to your experience. We welcome your feedback and comments as we continually strive to improve MinePlan to meet your needs. If you have questions about how to install the software, the Prominas Support team is available to support you. Thank you for choosing MinePlan. We look forward to continuing to serve you with exceptional products and services What's New in HxGN MinePlan Activity Scheduler v6.6 What's New in HxGN MinePlan Scheduler Optimizer v13.10.1 To check out more about this and…

Figura02 MPPE

D&T Prominas | Pushback Design Methods – MinePlan Project Evaluator (MPPE)

Pushback Design Methods: Different methodologies for defining the design of Pushbacks. Did you know that MinePlan Project Evaluator has different methodologies for generating Pushbacks? In MinePlan Project Evaluator (MPPE), when working on the Pushback task to generate mining phases, you can choose different strategies for generating pushbacks: Incremental Pushback Analysis or Directional Pushback Analysis. The Incremental method allows you to design a series of phases with relatively constant geometries. This projection is made by defining the depth, number of banks to be evaluated or width and a minimum mass value, in tons. In addition to these geometric parameters, a limit is chosen to identify the blocks of greatest economic value, ensuring that the opening of the phases are in the areas of greatest value. The Directional method, in addition to having the same premises as the Incremental, makes it possible to define an azimuth,…

Link Viewer - Reserves 4.5

D&T Prominas | Link Viewer – REserves

Link Viewer – Reserves: Visualization of cuts and topographies inserted in MinePlan Reserves 4.5. Did you know that MinePlan Reserves 4.5, released together with MinePlan 2023 Release 2, has a new option, which allows the user to view the selected cut or topography in its interface? The Link Viewer option, located in the Geometry Cuts and Surface Cuts tabs, makes it possible to highlight selected geometries and/or surfaces on the MinePlan 3D (MP3D) screen. To do this, the user must access Setup Reserves located in the MP3D Reserves menu, insert the desired geometries to perform the cubing and enable the Link Viewer option. Subsequently, when selecting a certain element in the tool interface, it will be highlighted in MP3D, as shown below. Figure 1: Link Viewer option – Mineplan Reserves 4. So, did you like this tip? For more information about the Link Viewer option…

Figura01 pushback

D&T Prominas | Appointment of Pushbacks in MinePlan Project Evaluator (MPPE)

Pushback Naming – MinePlan Project Evaluator: Automatically naming pushbacks generated during optimization. Did you know that the MinePlan Project Evaluator (MPPE) features an option that makes it easy to nominate different pushbacks created in your project? During the pit optimization stage, it is common to work with a large volume of information, especially after carrying out sensitivity analyses. Therefore, organizing data is a great way to facilitate the workflow of a project. In MinePlan Project Evaluator (MPPE), when working on the Pushback Task to generate mining phases, you can automatically name, through the use of tokens, the different pushbacks created by the optimization. This can be done via the Pushback Name option. Tokens can be assigned names considering parameters such as: incremental order of phases; economic function that was used; methodology for defining…

figura 1_Data Manager

D&T Prominas | Data Manager

Data Manager: Organizing data and managing object visualization. Did you know that MinePlan 3D (MP3D) has in its interface a section dedicated to the organization and management of your data? The Data Manager, located on the left part of the MinePlan interface, is responsible for functions such as managing, creating and deleting folders and objects from a project, opening and closing folders and objects, importing and exporting data, among others. . It is divided into two tabs: the Project View tab, which contains all project folders and objects in the upper part, and the contents of the selected folder in the lower part. And the Open View tab, where only the data that is open is shown at the top, and the Materials assigned to elements of those objects are shown at the bottom. Figure 1…

Release 2

HxGN MinePlan 2023 Release 2 features improvements in geostatistics and sequencing.

The MinePlan team has been actively listening and incorporating valuable customer feedback and has implemented several improvements as a result. This release covers a number of exciting features and enhancements to a variety of our tools. What's New in HxGN Geoscience MinePlan Multi-Indicator Variographic Analysis Multi-indicator variographic analysis has been added to the MinePlan Sigma geostatistics solution. Users can now conveniently analyze their multi-gauge overlay variograms, select parameters for multi-gauge kriging, and then send the selected parameters directly to the Model Interpolation Tool for model interpolation. This adds another important function to geostatistical tools for more accurate modeling on complex data with skewed distributions where more traditional variogram models may not be appropriate. Figure 1: Variographic Analysis of Multiple Indicators with input data and results visualized in MinePlan…