HxGN MinePlan

Figura02 MPPE

D&T Prominas | Pushback Design Methods – MinePlan Project Evaluator (MPPE)

Pushback Design Methods: Different methodologies for defining the design of Pushbacks. Did you know that MinePlan Project Evaluator has different methodologies for generating Pushbacks? In MinePlan Project Evaluator (MPPE), when working on the Pushback task to generate mining phases, you can choose different strategies for generating pushbacks: Incremental Pushback Analysis or Directional Pushback Analysis. The Incremental method allows you to design a series of phases with relatively constant geometries. This projection is made by defining the depth, number of banks to be evaluated or width and a minimum mass value, in tons. In addition to these geometric parameters, a limit is chosen to identify the blocks of greatest economic value, ensuring that the opening of the phases are in the areas of greatest value. The Directional method, in addition to having the same premises as the Incremental, makes it possible to define an azimuth,…

Link Viewer - Reserves 4.5

D&T Prominas | Link Viewer – REserves

Link Viewer – Reserves: Visualization of cuts and topographies inserted in MinePlan Reserves 4.5. Did you know that MinePlan Reserves 4.5, released together with MinePlan 2023 Release 2, has a new option, which allows the user to view the selected cut or topography in its interface? The Link Viewer option, located in the Geometry Cuts and Surface Cuts tabs, makes it possible to highlight selected geometries and/or surfaces on the MinePlan 3D (MP3D) screen. To do this, the user must access Setup Reserves located in the MP3D Reserves menu, insert the desired geometries to perform the cubing and enable the Link Viewer option. Subsequently, when selecting a certain element in the tool interface, it will be highlighted in MP3D, as shown below. Figure 1: Link Viewer option – Mineplan Reserves 4. So, did you like this tip? For more information about the Link Viewer option…

Figura01 pushback

D&T Prominas | Appointment of Pushbacks in MinePlan Project Evaluator (MPPE)

Pushback Naming – MinePlan Project Evaluator: Automatically naming pushbacks generated during optimization. Did you know that the MinePlan Project Evaluator (MPPE) features an option that makes it easy to nominate different pushbacks created in your project? During the pit optimization stage, it is common to work with a large volume of information, especially after carrying out sensitivity analyses. Therefore, organizing data is a great way to facilitate the workflow of a project. In MinePlan Project Evaluator (MPPE), when working on the Pushback Task to generate mining phases, you can automatically name, through the use of tokens, the different pushbacks created by the optimization. This can be done via the Pushback Name option. Tokens can be assigned names considering parameters such as: incremental order of phases; economic function that was used; methodology for defining…

figura 1_Data Manager

D&T Prominas | Data Manager

Data Manager: Organizing data and managing object visualization. Did you know that MinePlan 3D (MP3D) has in its interface a section dedicated to the organization and management of your data? The Data Manager, located on the left part of the MinePlan interface, is responsible for functions such as managing, creating and deleting folders and objects from a project, opening and closing folders and objects, importing and exporting data, among others. . It is divided into two tabs: the Project View tab, which contains all project folders and objects in the upper part, and the contents of the selected folder in the lower part. And the Open View tab, where only the data that is open is shown at the top, and the Materials assigned to elements of those objects are shown at the bottom. Figure 1…

Release 2

HxGN MinePlan 2023 Release 2 features improvements in geostatistics and sequencing.

The MinePlan team has been actively listening and incorporating valuable customer feedback and has implemented several improvements as a result. This release covers a number of exciting features and enhancements to a variety of our tools. What's New in HxGN Geoscience MinePlan Multi-Indicator Variographic Analysis Multi-indicator variographic analysis has been added to the MinePlan Sigma geostatistics solution. Users can now conveniently analyze their multi-gauge overlay variograms, select parameters for multi-gauge kriging, and then send the selected parameters directly to the Model Interpolation Tool for model interpolation. This adds another important function to geostatistical tools for more accurate modeling on complex data with skewed distributions where more traditional variogram models may not be appropriate. Figure 1: Variographic Analysis of Multiple Indicators with input data and results visualized in MinePlan…

Release2023_R1

HxGN MinePlan 2023 Release 1 features an innovative Block Model Management solution and much more!

The MinePlan development team has been hard at work listening to customer feedback and making improvements to improve the products. The first 2023 version of MinePlan includes an entirely new product and a number of new features in existing tools. HxGN MinePlan Block Model Manager This release introduces HxGN MinePlan Block Model Manager, a solution that addresses the complex challenges associated with managing project data. With MinePlan Block Model Manager, users can quickly populate, manage and share block models from HxGN MinePlan 3D and third-party systems. One of the main features of Block Model Manager is its new API, which simplifies integration with other systems, allowing data interoperability. This means you no longer need to manually import or export block model data, simplifying the process…

MPAS_02

D&T Prominas | MinePlan Activity Scheduler – Database

MinePlan Activity Scheduler – Database: New MinePlan Activity Scheduler (MPAS) storage option in MinePlan 2023 Release 2. Did you know that in the new version of MinePlan, an option for remote storage of MPAS projects has been added? The latest MinePlan update, MinePlan 2023 Release 2, includes an option that allows users to store and access their MPAS projects remotely, also allowing access by more than one simultaneous user to the same project. To use this option, the user must map a server, where the project will be stored, through the option Configure Remote Data Store Location, available in MPAS/Planner Project Converter in the Utilities menu of MinePlan 3D (MP3D). It is necessary to map the Host (ID) of the server and the Port of access to it, and then create and configure the project normally…

Imagem 02 (1)

D&T Promines | MPSO Shovel Control

MPSO Shovel Control: Control of excavators in sequencing. Did you know that MinePlan Schedule Optimizer (MPSO) has an option that allows the user to easily control/associate excavators in their project? The Shovel Fleets option, located on the Advanced Constraints tab of the MPSO, allows the user to associate excavators by phases, banks, cuts and periods, in addition to allowing control of the number of equipment to be used. When accessing this tab, the central windows can be used to specify which of the options the equipment will be associated with. In the Properties window, you must select Shovels as the restriction type, and later, specify the periods in which this restriction will be applied and the desired equipment in the Shovels Fleets option. Use the Apply option to confirm it. Figure 1: Advanced Constraints tab – MPSO. After clicking Apply, you can access the Shovel Constraints window and…