Rua Paraíba, 1465 / 11th Floor. Savassi. Belo Horizonte

MinePlan Releases: MinePlan 2020 Release 1

Hi!

We would like to announce the launch of “MinePlan 2020 Release 1” available on the website of Hexagon Mining in session “Client Center”, which can be accessed via the link //client-portal.hexagonmining.com/ClientPortal.aspx.

 The highlights of this release are: the new tool Reconciliation Tool, custom hotkey configuration via option hot keys, integration with the Leyca Cyclone 3DR and the option of destinations of the type Process Points in MinePlan Schedule Optimizer (MPSO)

Below you can check the complete list with the various fixes and improvements:

HxGN MinePlan 3D 15.70 includes the following improvements: 

New Tools and Features:

  • Remote Folder, a functionality to create remote folders that allows dynamic links to external projects;
  • The resource hot keys allows users to define custom hotkeys in the MP3D;
  • Implementation of the integration of Leyca Cyclone 3DR as
  • new tool Reconciliation Tool, which calculates the reconciliation of mined and planned solids from surfaces, generating reports;
  • new tool Bulk DXF Export which exports multiple objects to different files at once DXF;

General

  • files from crash dump or crash dump are now created in the folder C:\Users\USERNAME\Documents\HxGN\error_reports;
  • Improvements where the toolbars of the xViewer mixed after suspending the computer.
  • Documentation improvements for hotkeys;
  • Improved creation of virtual elements when using the function Distance Along Polyline;
  • Tool improvement Drape Tool when working with surfaces.

materials

  • Ranking performance improvements when using the option Prioritize Model Codes.

Logic 1.50.3 includes the following improvements:

  • Improvements in tool performance.

Model Calculation Tool 2.0.5 includes the following improvements:

  • Global variables are now available in logic
  • Template items are now available on logic

Image viewer 1.1.0 includes the following improvements:

  • The image viewer is now synchronized with the dialog box of the query at the MP3D.

Haulage 7.4.1 includes the following improvements:

  • Improved when cloning a transport plan where files lost database reference.

HxGN MinePlan Blast 4.30 includes the following improvements:

(originally released independently on March 31, 2020)

  • Added functionality to manually name holes in the new design dialog;
  • Improved naming of columns when defined by a row;
  • Added the option to clone a substring, using the original substring name;
  • Added the option to keep the holes moved after editing the planes;
  • Improved when importing the drilled holes intervals, limiting by the projected length;
  • Improvement with expressions of a base surface, when the hole dip is greater than -90 degrees;
  • Improved importing properties from a database;
  • Improved properties when the field is of type Small Real drillhole; 
  • Improvements in creating properties for holes that use numbering.
  • Improved when renaming meshes created through polylines;
  • Added the possibility to automatically recalculate or automatically rename from the design dialog;
  • Improvements with the mass calculations of consumables in the imperial unit;
  • Added the ability to export the mesh boundary as a CSV file;
  • Improvements in updating the view when changing load, spacing or orientation in the Design.

HxGN MinePlan Project Evaluator 1.0.4 includes the following improvements:

  • Added the option to use the query in the 3D view shell in MP3D Viewer;
  • Multiple blocks in the Z direction can be selected in the option Audit blocks;
  • Added the option to exclude a calculated field in reports;
  • Added the option to generate the final pits using the LG algorithm;
  • Added the option to set the width between phases when generating pushbacks;
  • Added the option to visualize the restrictions used when generating the final pits;
  • Allowed to enter decimal values in the discount rate;
  • Added the possibility to insert rows and columns of total sums in reports.

HxGN MinePlan Sigma 1.3.4 includes the following improvements: 

(originally released independently on March 31, 2020)

  • Improvements in layer contact boundary analysis and option-oriented intrusions 3D Contact Plots;
  • Bank level variables and block coordinates make the reporting and analysis of block models more flexible;
  • Manual control over axis legends enhances the graph information displayed in reports;
  • Additional lines with default and custom fit in bivariate plots (Scatter Plot and QQ Plot) improve the relationship analysis of variables.
  • Unlimited bulk export of graphics to images reduces the time needed to prepare images for inclusion in documents;
  • The ability to select up to ten block models significantly improves workflows for comparing models created for different purposes.

HxGN MinePlan Activity Scheduler (MPAS) 4.7.7 includes the following improvements:

  • Improved visualization of the fields of the haulage in the reports;
  • in option Activity Single Import, added the option to select the booking logic;
  • Improved function for exporting activities to the SQL;
  • Improved scrollbar;
  • Added the function Python to calculate the surface area on the projection of a solid.

HxGN MinePlan Schedule Optimizer (MPSO) 12.0 includes the following improvements:

  • Added a new type target Process Points, which can perform calculations on Python;
  • Improved reporting when phase cuts are extracted 100%;
  • The Help documentation has been updated with more details for the Full Report.

MinePlan Runtime Environment (MRE) 2.3 includes the following improvements:

  • Runtime improvement when updating the Visual C 14 oldest to the latest version required for the Cyclone 3DR at the

To the next!!!

Leave a comment

en_US
Contact us!