MinePlan Releases: MinePlan 2020 Release 2

Hi!

We would like to announce the launch of “MinePlan 2020 Release 2” available on the website of Hexagon Mining in session “Client Center”, which can be accessed via the link //client-portal.hexagonmining.com/ClientPortal.aspx.

 The highlights of this release are: the improvement of the tool reservations to version 4.0, with new user interface, tools integration Activity Scheduler and Blast as Mine Enterprise and the new product Terrain Exporter to allow file export of surfaces to be imported into Mine Enterprise.

Below you can check the complete list with the various fixes and improvements:

HxGN MinePlan 3D 15.80 includes the following improvements:

  • Improvement when using a set of polygons in the mscode;
  • "What's New” will only create an alert when there is new content;
  • Fixes instability in pit expansion when using the option slots;
  • Improved hotkey assignment for Camera Positions;
  • Tool enhancement auto slicer when it is used Gridset;
  • Fix broken links in help;
  • add the datum GDA2020 the tool Coordinate System Manager.

IM Engine 1.10.8

  • Function improvement Multipole Expansion;
  • Improvement in the calculation of the centroids of Downhole Points, depending on whether the range is inside or outside a zone.

Logic 1.50.4

  • Adjustments when using relative paths with the Model Calculation Tool.

MP Reserves UI 4.0

  • Added a new and improved user interface;
  • file support commit;
  • Possibility of using several sets of grades of cutoff;
  • Inserted the option to calculate the reserve between two surfaces;
  • Added the possibility to select cuts in the viewer or on a block model range;
  • The number of Discrete Items allowed has been increased;
  • Allows you to perform an offset of the item zone;
  • Added option to remaining at the Pray Percent Item.

MS Reserve 3.40.13

  • All items referring to MSReserve 3.4 have been moved to a sub-menu named Reserves 3.4 (Legacy), located in the Model menu;
  • Rename the MSRserve option to MSReserve 3.4 (Legacy) in the MinePlan menu.

Model Interpolation Tool 1.8.3

  • Improvement when using Kriging interpolation in option Dynamic Unfolding;
  • Improved when performing tests using the option One Block;
  • Fix behavior when using 3 structures specified in the panel Variogram.

Database Manager 4.0

  • Adds support for Torque 6.0.

Reconciliation Tool 1.0.1

  • Update of help.

Terrain Exporter 1.0

  • New product to allow file export of surfaces to be imported into Mine Enterprise.

HxGN MinePlan Schedule Optimizer 12.50 includes the following improvements:

  • Integration with the new tool reservations;
  • Possibility to format precision in option Material Mapping;
  • Added the option to save the project when the license is removed;
  • Added warning message if no subzones in a target are available for export;
  • Improved reporting when there is no type target Mill;
  • Improved when splitting Volume and Tons into different proportions;
  • Improvement in the value of grades weighted by another item (IWA);
  • Improved export format Full Report;
  • Improved sequencing of destinations where subzones were not being respected;
  • Fixes an issue with unsuccessful sequencing formulation;
  • Fix sequencing not running issue when load time in loop is blank
  • Improved updating of reservations when the reservation logic is accessed;
  • Fixes invalid target behavior when performing sequencing calculation;
  • Improved inventory reports;
  • At the Analysis Report, the field “_material_from” reports destination resumed instead of 'N/A';
  • Improved when applying calendar settings;
  • Fixes an issue with non-stored material mappings for certain mining areas;
  • Improved update of Dig Rate;
  • Improved configuration of diglines;
  • Corrects inconsistency in the information of tons and volumes resumed in the Analysis Report;
  • Fixed inconsistency in constraints when changing view mode;
  • Gradebins/Cutoffs without reservations were removed from the Material Mapping.

HxGN MinePlan Activity Scheduler 5.0 includes the following improvements:

  • Integration with the new reservations and possibility to edit the existing booking logic;
  • Integration with the Mine Enterprise to post activities and receive the status of completed activities;
  • Improved window display Resources Rates;
  • improvement in pivot report;
  • Performance improvement when moving targets in Process Canvas;
  • Improvement when using Object Name in option Group By when importing activities using Activity Set;
  • option improvement Split by Work;
  • Improved when importing activities using Activity Set;
  • Fixes an issue with the tonnage value in the Scrolling Grid;
  • Added option Preview Reserves to view reservations when creating a polygon;
  • Performance improvement when calculating material routing;
  • Option enhancement GetPlanArea() when using solids with holes;
  • improvements of templates when creating new activities;
  • Fixes unexpected behavior when using the option Multi Import;
  • Improvements to the option model coding of Release;
  • Improved validation tool when using custom levels;
  • Improved Reconciliation tool;
  • Fixes error when opening geometric objects.

HxGN MinePlan Blast 4.50 includes the following improvements:

  • Added the functionality to generate blast area exclusion zone;
  • Integration with the Mine Enterprise;
  • Conversion of combined meshes to separate meshes;
  • Added integration support for the new booking logic;
  • Improvement in the performance of Electronic Manual Timing;
  • Improved update of decks;
  • Fixes inconsistencies when using naming templates and Polyline Patterns;
  • Improved property import templates with header line;
  • Improved import of mesh properties;
  • Fixes change in imported property values after closing;
  • Improved mooring update after editing a mesh;
  • Improved block model coding;
  • Improvement in the nomenclature of meshes that use numerical counting and that use intervals for naming;
  • Improved import/export of holes;
  • Improved graphics pivot chart when weighting reserve values.

GeoLogic 1.5.2 includes the following improvements:

  • remove the option Surface Rationalization;
  • Improved when filtering Sample Site;
  • improvement when selecting drillholes;
  • Improvement when canceling the option Strata Set Selection;  
  • Improved when generating surfaces when zone extents intersect with the intrusion solid;
  • Fixes behavior where HW and FW were inverted.

HxGN MinePlan Drillhole Manager 6.0 includes the following improvements:

  • Added security exclusion zone support for checking fire plans.

Basis 17.70.2 was independently released on July 27, 2020 and included the following updates:

  • Improved MSCS when running in multiple simulations to Locally Varying Mean;
  • Fixes problem with date and in creating ellipsoid objects;
  • Improvements in procedures date and PSCSIS.dat, in the search ellipsoid parameters and in the number of simulations;
  • Adjustment in the procedure date in the description of option 4;
  • Improved M624MIK procedure and correctly reporting resource cutoffs.

Economic Planner 4.0.13 was released independently on July 20, 2020 and included the following update:

  • Internal Licensing Modification.

To the next!!!