Rua Paraíba, 1465 / 11th Floor. Savassi. Belo Horizonte

Tips & Tricks Prominas/MineSight: MSPlanner in your everyday life!

Often, making the mine's production schedule more flexible in the short term is not an easy task! But then, how to meet the demands of materials for processing and the opportunities that the market has in store for us? MineSight Planner is the ideal mine advance management tool to guide this decision making. Allows the user to simulate the result of blending of the most diverse types of materials available in the mine, through a previously configured reserve logic, and define the best time to mine these advances.

When importing the cuts, through the option AutoSlicer & Target Material, It is possible to discretize the mining plans according to specific materials or cut grades, which makes decision-making more dynamic in the defined operational horizon:

In an intuitive way, the user is able to reproduce the flow of mined materials to the respective destinations and assigning/calculating their goals and operational restrictions to each one of them.

MSPlanner allows the user to fully interact with mining advances, making it possible to reallocate these advances between short-term horizons and adapt plans to possible unforeseen events or necessary decision-making (for example: quality changes in the power plant , need to force the resumption of material in stock or meet the stocking goal of a certain type of material, etc).

through the option Override Routing (overlay destinations), MSPlanner allows the user detailed control over the destinations of mining advances, which reflects on opportunities associated with the planned dilution of ore fronts. In addition, it is possible to program the exact proportion of material that will go to a specific destination, facilitating the sizing of equipment and hours worked for such activity. In the example below, we have the exact proportion of waste that will be destined for the paving of roads, that is, 600t – 20 trips of 30t trucks.

Through customizable reports, mining plan information is easy to read and can be exported to the most diverse formats. In addition to making it possible to insert meters of total material moved to the plant/piles.

MSPlanner provides the user with high-level short-term planning by managing mine advances and mapping materials and their destinations.

To the next!