Rua Paraíba, 1465 / 11th Floor. Savassi. Belo Horizonte

D&T Promines | MinePlan Schedule Optimizer

MinePlan Schedule Optimizer  | Assignment of Excavators by Diglines: Inclusion of new features in MinePlan Schedule Optimizer at the MinePlan 2022 Release 4.

Did you know that the new release of MinePlan, O MinePlan 2022 Release 4, presents new features for the MinePlan Schedule Optimizer that facilitate visualization and validation of mining plans? 

O MPSO consists of a unique and scalable solution for preparing mine plans. Users of MinePlan are executing optimized plans for the viability and useful life of their mines, or even production plans on an even shorter horizon. Hexagon continues to add features that put a greater operational control in the hands of users and allow them to clearly transmit the operational plans based on the results produced by the MPSO.

Excavators can now be assigned to a cut group (diglines), allowed more control about how digging equipment is assigned. Without this control, even if at first glance the plan seems satisfactory, it can become unfeasible, with excavators constantly moving around the mine, without taking into account the time and cost of moving the equipment.


An effective plan is one that is clear in its information and can be accurately executed by those given its guidelines and goals. The new update also includes visualization properties that allow you to effectively observe where excavators should be in each sequencing period.


So, did you like this news? For more information about the MinePlan Schedule Optimizer, in addition to other functions of the MinePlan, contact our team and we will be happy to serve you.

To the next!!!

Team Prominas Mining

Leave a comment

en_US
Contact us!